What's New on Your Project Boards
Your Project List, Board and Calendar views have a set of new columns, indicators and filters designed to show you what has changed on a project β not just what work exists on it. This article covers each one.
Move Out date change indicator
What it does
When a resident's move-out date changes in your PMS, HappyCo updates the project's Move Out Date and flags the project so you know to reschedule.
π₯ Watch the tutorial here
π Read the full training article here
Where you'll see it
- A banner at the top of the List, Board and Calendar views
- A notification icon beside the Move Out Date, with the date cell highlighted, on the List and Board views
- A banner with a Dismiss button in the project side drawer, directly below Status and Priority
Seeing the previous date
Hover over the Move Out Date to see the date it changed from. If the date has changed more than once since you last dismissed the flag, the tooltip shows the most recent previous date.
Clearing the flag
Open the project side drawer and select Dismiss. The banner and the icon clear from every view, and stay cleared when you reload.
Dismissing requires the Change Project Dates permission. Without it you will still see the flag, but the Dismiss button is greyed out.
When the flag does not appear
- On board types other than Make Ready
- On projects not integrated with a PMS
- When someone edits the Move Out Date by hand in HappyCo
- On projects already marked Completed β these do not receive move-out date updates from the PMS at all
Vendor assignment status
What it does
Every task assigned to a vendor shows a small status icon beside the assignee, so you can see who has picked up the work without opening each task.
| Icon | Status | What it means |
|---|---|---|
| Purple | Notified | The vendor has been emailed. Delivery can take 5 to 30 minutes. |
| Green | Accepted | The vendor accepted the assignment. |
| Red | Declined | The vendor declined. Reassign or contact them. |
The icon reflects the most recent assignment request. If dates move and the request is re-sent, the status returns to Notified until the vendor responds again.
You'll find it on the List view's hover popover, in the Project Detail drawer, and on the Stage and Progress popovers.
Turn Time column
What it does
Shows how long a completed project took, in days.
How it's calculated
The number of days from the unit's move-out date to the project's completion, rounded to the nearest tenth of a day. Hover the column header for the same explanation in the product.
This is the same calculation used by Property Profile, so the two agree.
What to expect
- Only completed projects show a value. Anything still in progress is blank.
- Projects completed from 1 January 2026 onward have been backfilled, so you have history immediately.
- Time a project spent On Hold is not subtracted.
- A project with no move-out date will not have a turn time.
Β
Created On column
Shows the date each project was created, in the property's time zone, immediately before Start Date. Use it to see which projects have appeared since you last looked at the board, or as an audit reference.
Showing and hiding the new columns
Both Turn Time and Created On are on by default and can be hidden.
- Open the Show filter on the List or Board view.
- Toggle the column off.
Your choice is remembered when you navigate away and come back. Column changes β hiding, reordering, resizing β are also written to the page URL, so you can save a customised view as a Favorite.
Calendar: filtering by vendor and sub-category
Assignee filter
The filter previously labelled Project Assignee is now Assignee, and it lists your vendors as well as your users. Select a vendor to see just that vendor's scheduled work.
Category filter
The Category filter now lets you select either a category or one of its sub-categories.
Why inspections disappear under these filters
When you filter by a vendor or by a category or sub-category, inspections are hidden from the Calendar.
This is intentional. Inspections are always assigned to a user, never to a vendor, and they do not belong to a category β so neither filter can be applied to them. Rather than leave them showing as though they had passed the filter, the Calendar leaves them out.
Clear the filter and inspections return. Filtering by a user assignee still shows that user's inspections as normal.
Board: stage preview dates
The stage preview date now shows the date of the next open scheduled task in that stage.
Previously it showed the next scheduled task date regardless of status, which meant a stage whose next-dated task was already complete displayed a date in the past. The date you see now is always upcoming work.
List: projects per page
The List view page-size selector offers 25, 50 or 100 projects per page, defaulting to 25. Your selection is remembered and included when you save the view as a Favorite.
What's not included
- Mobile β everything in this article is HappyCo Manage on the web.
- Vendor notifications when dates change β the Move Out date flag alerts your team, not your vendors.
- On-hold time excluded from Turn Time.
Frequently asked questions
Why can't I dismiss the move-out date banner?
Dismissing requires the Change Project Dates permission. Ask an administrator to grant it, or have a colleague who has it clear the flag.
The move-out date changed in our PMS but nothing flagged. Why?
Check three things: the project is on a Make Ready board, the project is integrated from your PMS, and the project is not already marked Completed. Completed projects do not receive move-out date updates.
Turn Time is blank on a project we completed. Why?
Either it was completed before 1 January 2026, or the project has no move-out date recorded.
Our own turn time figure doesn't match yours.
The most common reason is on-hold time, which HappyCo does not subtract. The calculation is move-out date to completion.
Can I turn these features on myself?
Some are already enabled, some have been launched to Early Access and need to be enabled through Release Updates in Admin Center. That list will be shown here in the near future.
Did the vendor get my task if the icon is purple?
Purple means the notification email has been sent. Delivery can take up to 30 minutes; the icon turns green when the vendor accepts.