Tasks is Happy Property's work order management feature: your team creates, assigns, tracks and completes maintenance work in one place. Use it to run day-to-day work orders and, from the Projects board, unit-turn (make ready) work.
In this article
- How Tasks connects to your PMS and Inspections
- Opening the Task List and Projects board in Happy Property
- The Task List
- Extra Task List columns
- Task List badges and sorting
- Task List quick filters
- Searching and filtering tasks
- Task List filter options
- Task Details panel
- Completing a task
- Creating a task in Happy Property
- Before you notify a vendor
- Tasks and Inspections
- Make Ready Projects board
- Project Details panel
- Adding a task from the Projects board
- Searching and filtering the Projects board
How Tasks connects to your PMS and Inspections
Tasks works alongside two other parts of your account:
- PMS integration: when configured for your account, tasks can sync with your property management system.
- Inspections: when an inspection is completed, items configured on the inspection template to generate tasks appear in your task list with associated photos and notes.
| Where | What you can do |
|---|---|
| Both | Create, assign and complete tasks; change status and priority; add comments and attachments; see other open work at the same unit |
| Web (Happy Property) only | Make Ready Projects board, task settings such as Completion Requirements, vendor directory, bulk assign or delete |
| Mobile (HPMA) only | My Work list, map view, push notifications, task timer, signature capture |
Opening the Task List and Projects board in Happy Property
Log in to Happy Property
Log in to Happy Property.
Choose a property or property group
Select the property or property group you want to work in.
Open the Task List
From the main navigation menu, select Tasks.
Open the Projects board
To open the unit-turn Projects board, select Projects from the main navigation menu.
Tip
Make Ready is a separate settings area used to configure make-ready defaults and materials. It is not the entry point for the Projects board.
The Task List
The Task List gives you a consolidated view of tasks for your selected property or group. By default it shows open work orders; switch tabs to view completed or all tasks.
| Column | Description |
|---|---|
| Task | Work category (and subcategory, when applicable), plus a summary or description |
| Priority | Normal or Urgent |
| Status | Open, On Hold, Complete, or Canceled (where enabled) |
| Location | The unit or area where the work will be performed |
| Assignee | The team member or vendor responsible for the task |
| Scheduled | The scheduled date for the work |
Extra Task List columns
Depending on your account configuration and the tab you have selected, you may also see:
- Type: work order type (for instance, Service Request, Turn)
- Created: how long ago the task was created (on the Open tab)
- Completed: when the task was completed (on the Complete tab)
Task List badges and sorting
- Urgent tasks display a red priority tag.
- On Hold tasks display a yellow status tag.
- Open tasks sort by Scheduled date (earliest first) by default.
- Click any column heading to sort by that column.
Task List quick filters
At the top of the Task List, use the quick-filter controls to switch between:
- Work Orders and Project Tasks
- Open, Complete, and All (where available)
Searching and filtering tasks
Search by keyword
Type a keyword in the Search bar at the top of the Task List.
Open the filter panel
Click the filter icon on the search bar.
Choose your filters
Toggle the filters you want on or off. The options are listed below.
Apply the filters
Click Apply Filters to update the list.
Tip
To clear filters, use the search bar or reset selections in the filter panel.
Task List filter options
- Assignee (including unassigned)
- Category
- Location
- Resident
- Status
- Type (when enabled for your account)
- Urgent
- Scheduled date range
- Other options depending on your account configuration
Missing tasks for a unit?
Check that no filters are applied and that you have selected the correct property or property group.
Task Details panel
Click any task in the list to open the Task Details panel, where you view and edit the task.
- Category & Subcategory: shown at the top of the panel
- Priority: Normal or Urgent; editable from the panel header
- Status: Open, On Hold, or Complete (and Canceled where enabled)
- Assignee: click to assign or reassign. The assignee may receive a notification depending on your account setup and assignee type (users vs. vendors)
- Scheduled date: click to set or update the scheduled date
- Reporter: the person who raised the task
- Entry instructions: permission-to-enter settings and entry notes
- Resident details: residents and contact numbers attached to the task
- Description: free-text notes; click to edit
- Project • Stage: link the task to a Make Ready project and stage
- Also at this unit: open work orders and project tasks in the same unit
- Activities: post updates or questions. Click Attach Files to add photos or documents. Click Comment to add a comment
Updates made through the HappyCo AI connector
When a change is made through the HappyCo connector (for example, a work order updated by Claude), the task's Activities on the web show it as made by the person who asked for the change, marked “via HappyCo AI connector”.
Completing a task
-
Open the task
Click the task in the Task List to open the Task Details panel. -
Use the completion button
When the work is done, click the completion button at the bottom of the Task Details panel, such as Complete Task.Tip
The button label depends on your business's completion requirements: Complete Task, Complete Task with Comment, or Complete Task with Photo.
Completed tasks and your PMS
If PMS integration is enabled for your account, completed tasks can sync back to your property management system according to your integration configuration.
Setting which tasks need a comment or photo
In Completion Requirements, choose the work categories that need a comment or photo before a work order can be completed. Task settings such as Completion Requirements are on the web (Happy Property) only.
Completing a work order again: keeping the original completion time
The setting Allow users to re-open closed work orders, modify details, and retain the original closed work order date and time (web and mobile) is a checkbox in Settings > Tasks > Completion Requirements.
- Off by default.
- Only people who can manage task settings can change it.
- On: when a work order that was completed before is completed again, the tech is asked whether to update the completion date, on desktop and in the mobile app.
- Off: no prompt appears, and the work order records the time it was completed again.
Creating a task in Happy Property
Start a new task
Click New Task.
Choose category and location
Select a Category and Location.
Choose the type
Select the task Type (when enabled for your account).
Set the scheduled date
Set the Scheduled date.
Confirm the assignee
Confirm the Assignee.
Tip
New tasks are assigned to you by default. Click Assignee to reassign.
Add optional details
Optionally add a Reporting Resident, entry instructions, and a Description.
Create the task
Click Create Task.
Vendors are not notified automatically
If you assign a task to a vendor at creation, the vendor is not automatically notified. You may need to notify the vendor separately from the task detail view.
Before you notify a vendor
- The task is assigned to a vendor.
- The task isn't completed.
- Your business has vendor communication turned on.
Tasks and Inspections
- Tasks is natively integrated with Inspections.
- When an inspection is completed, any item whose template rating is configured to generate a task appears in your Task List, with associated photos and notes.
- Tasks can also be viewed and managed in the Happy Property: Maintenance mobile app (HPMA), where Inspections and Tasks live in the same app.
Make Ready Projects board
The Projects board gives you a list view of unit-turn progress across your property. Open it from the Projects icon in the main navigation menu.
Each row represents a unit-turn project. Columns may include unit, property, progress, status, priority, assignee, move-out date, target availability, and more depending on your board configuration.
| Status | Meaning |
|---|---|
| Scheduled | The project is planned but not yet started |
| In Progress | Work has begun on at least one stage |
| On Hold | The project is paused |
| Complete | All stages and tasks are done |
Project Details panel
Click any project row to open the Project Details panel. From here you can:
- View tasks and inspections grouped by Stage (for instance, Pre Move-out, Move Out, Paint, Maintenance, Flooring)
- Assign a Project Assignee responsible for the overall turn
- Set a Move-in date and Target Availability date
- Add Notes for the project
- Click any task or inspection within a stage to open its details
Adding a task from the Projects board
Add a task without leaving the board: click New Task at the bottom of the Project Details panel.
Searching and filtering the Projects board
Use the search bar and filter options at the top of the Projects board to find specific units or filter by status, priority, assignee, and more.
Tasks must be linked to a project and stage
Tasks must be linked to a project and stage to appear on the Projects board. If you are not seeing a unit or its tasks, confirm the project is set up correctly and the tasks are assigned to the appropriate stage.