Tasks is Happy Property's work order management feature: your team creates, assigns, tracks and completes maintenance work in one place. Use it to run day-to-day work orders and, from the Projects board, unit-turn (make ready) work.

How Tasks connects to your PMS and Inspections

Tasks works alongside two other parts of your account:

  • PMS integration: when configured for your account, tasks can sync with your property management system.
  • Inspections: when an inspection is completed, items configured on the inspection template to generate tasks appear in your task list with associated photos and notes.
Where each part of Tasks works: the web (Happy Property) or the mobile app (HPMA)
Where What you can do
Both Create, assign and complete tasks; change status and priority; add comments and attachments; see other open work at the same unit
Web (Happy Property) only Make Ready Projects board, task settings such as Completion Requirements, vendor directory, bulk assign or delete
Mobile (HPMA) only My Work list, map view, push notifications, task timer, signature capture

Opening the Task List and Projects board in Happy Property

1.  Log in to Happy Property

Log in to Happy Property.

2.  Choose a property or property group

Select the property or property group you want to work in.

3.  Open the Task List

From the main navigation menu, select Tasks.

Open the Task List

4.  Open the Projects board

To open the unit-turn Projects board, select Projects from the main navigation menu.

  Tip

Make Ready is a separate settings area used to configure make-ready defaults and materials. It is not the entry point for the Projects board.

The Task List

The Task List gives you a consolidated view of tasks for your selected property or group. By default it shows open work orders; switch tabs to view completed or all tasks.

Task List columns
Column Description
Task Work category (and subcategory, when applicable), plus a summary or description
Priority Normal or Urgent
Status Open, On Hold, Complete, or Canceled (where enabled)
Location The unit or area where the work will be performed
Assignee The team member or vendor responsible for the task
Scheduled The scheduled date for the work

Extra Task List columns

Depending on your account configuration and the tab you have selected, you may also see:

  • Type: work order type (for instance, Service Request, Turn)
  • Created: how long ago the task was created (on the Open tab)
  • Completed: when the task was completed (on the Complete tab)

Task List badges and sorting

  • Urgent tasks display a red priority tag.
  • On Hold tasks display a yellow status tag.
  • Open tasks sort by Scheduled date (earliest first) by default.
  • Click any column heading to sort by that column.

Task List quick filters

Task List quick filters

At the top of the Task List, use the quick-filter controls to switch between:

  • Work Orders and Project Tasks
  • Open, Complete, and All (where available)

Searching and filtering tasks

1.  Search by keyword

Type a keyword in the Search bar at the top of the Task List.

2.  Open the filter panel

Click the filter icon on the search bar.

Open the filter panel

3.  Choose your filters

Toggle the filters you want on or off. The options are listed below.

4.  Apply the filters

Click Apply Filters to update the list.

  Tip

To clear filters, use the search bar or reset selections in the filter panel.

Task List filter options

  • Assignee (including unassigned)
  • Category
  • Location
  • Resident
  • Status
  • Type (when enabled for your account)
  • Urgent
  • Scheduled date range
  • Other options depending on your account configuration

  Missing tasks for a unit?

Check that no filters are applied and that you have selected the correct property or property group.

Task Details panel

Task Details panel

Click any task in the list to open the Task Details panel, where you view and edit the task.

  • Category & Subcategory: shown at the top of the panel
  • Priority: Normal or Urgent; editable from the panel header
  • Status: Open, On Hold, or Complete (and Canceled where enabled)
  • Assignee: click to assign or reassign. The assignee may receive a notification depending on your account setup and assignee type (users vs. vendors)
  • Scheduled date: click to set or update the scheduled date
  • Reporter: the person who raised the task
  • Entry instructions: permission-to-enter settings and entry notes
  • Resident details: residents and contact numbers attached to the task
  • Description: free-text notes; click to edit
  • Project • Stage: link the task to a Make Ready project and stage
  • Also at this unit: open work orders and project tasks in the same unit
  • Activities: post updates or questions. Click Attach Files to add photos or documents. Click Comment to add a comment

  Updates made through the HappyCo AI connector

When a change is made through the HappyCo connector (for example, a work order updated by Claude), the task's Activities on the web show it as made by the person who asked for the change, marked “via HappyCo AI connector”.

Completing a task

  1. Open the task
    Click the task in the Task List to open the Task Details panel.
  2. Use the completion button
    When the work is done, click the completion button at the bottom of the Task Details panel, such as Complete Task.

      Tip

    The button label depends on your business's completion requirements: Complete Task, Complete Task with Comment, or Complete Task with Photo.

  Completed tasks and your PMS

If PMS integration is enabled for your account, completed tasks can sync back to your property management system according to your integration configuration.

  Setting which tasks need a comment or photo

In Completion Requirements, choose the work categories that need a comment or photo before a work order can be completed. Task settings such as Completion Requirements are on the web (Happy Property) only.

  Completing a work order again: keeping the original completion time

The setting Allow users to re-open closed work orders, modify details, and retain the original closed work order date and time (web and mobile) is a checkbox in Settings > Tasks > Completion Requirements.

  • Off by default.
  • Only people who can manage task settings can change it.
  • On: when a work order that was completed before is completed again, the tech is asked whether to update the completion date, on desktop and in the mobile app.
  • Off: no prompt appears, and the work order records the time it was completed again.

Creating a task in Happy Property

1.  Start a new task

Click New Task.

2.  Choose category and location

Select a Category and Location.

3.  Choose the type

Select the task Type (when enabled for your account).

4.  Set the scheduled date

Set the Scheduled date.

5.  Confirm the assignee

Confirm the Assignee.

  Tip

New tasks are assigned to you by default. Click Assignee to reassign.

6.  Add optional details

Optionally add a Reporting Resident, entry instructions, and a Description.

7.  Create the task

Click Create Task.

Create the task

  Vendors are not notified automatically

If you assign a task to a vendor at creation, the vendor is not automatically notified. You may need to notify the vendor separately from the task detail view.

Before you notify a vendor

  • The task is assigned to a vendor.
  • The task isn't completed.
  • Your business has vendor communication turned on.

Tasks and Inspections

  • Tasks is natively integrated with Inspections.
  • When an inspection is completed, any item whose template rating is configured to generate a task appears in your Task List, with associated photos and notes.
  • Tasks can also be viewed and managed in the Happy Property: Maintenance mobile app (HPMA), where Inspections and Tasks live in the same app.

Make Ready Projects board

Make Ready Projects board

The Projects board gives you a list view of unit-turn progress across your property. Open it from the Projects icon in the main navigation menu.

Each row represents a unit-turn project. Columns may include unit, property, progress, status, priority, assignee, move-out date, target availability, and more depending on your board configuration.

Common project status values
Status Meaning
Scheduled The project is planned but not yet started
In Progress Work has begun on at least one stage
On Hold The project is paused
Complete All stages and tasks are done

Project Details panel

Project Details panel

Click any project row to open the Project Details panel. From here you can:

  • View tasks and inspections grouped by Stage (for instance, Pre Move-out, Move Out, Paint, Maintenance, Flooring)
  • Assign a Project Assignee responsible for the overall turn
  • Set a Move-in date and Target Availability date
  • Add Notes for the project
  • Click any task or inspection within a stage to open its details

Adding a task from the Projects board

Add a task without leaving the board: click New Task at the bottom of the Project Details panel.

Searching and filtering the Projects board

Use the search bar and filter options at the top of the Projects board to find specific units or filter by status, priority, assignee, and more.

  Tasks must be linked to a project and stage

Tasks must be linked to a project and stage to appear on the Projects board. If you are not seeing a unit or its tasks, confirm the project is set up correctly and the tasks are assigned to the appropriate stage.