Task Link connects a task to a project at the task's location, using the Link to Project field on the task.

Use it to attach a task to a project, or to remove that link when the task no longer belongs to the project.

  1. Choose a project in the Link to Project field
    On the task, pick the project in the Link to Project field.

      Tip

    If the field shows No Projects at Location, there is no project at the task's location to link to.

  1. Select Unlink Project
    On the task, select the Unlink Project control.
  2. Confirm the unlink
    In the Unlink Task from Project window, press Yes, Unlink.

  How tasks relate to projects

Tasks (work orders) belong to project boards. Turn work is tracked as tasks on the board.